12.12.2016

Dates for 2017

ChainMaster Bühnentechnik GmbH is once again in 2017 organizing training seminars devoted to BGV D8 / D8plus chain hoists and controllers. These will be held in the 39th calendar week.

Those attending the workshops under the direction of Matthias Pohl and Stephan Geidel will obtain an overview of the SQ P2 standards as well as the proper handling, maintenance and testing of ChainMaster chain hoists. The requisite information will be presented in both theoretical and practical form. Participants will learn to conduct tests and perform adjustments to the various safety devices unassisted. They will also obtain the knowledge needed to select the right chain hoists and controllers for different applications and environments. Participants will then be tested and personal certificates issued to all who successfully complete the course.

The courses run from Monday to Wednesday and involve both the theory and the practice of handling BGV D8 / D8plus chain hoists. They cover the legal fundamentals as well as the equipment, construction and manner of operation of chain hoists and their controllers.

Outside the dates listed, courses can be booked separately by companies and educational institutions. Further information concerning the courses can be found at  www.chainmaster.de.

to the top


 

18.01.2016

Dates for 2016

ChainMaster Bühnentechnik GmbH is once again in 2016 organizing training seminars devoted to BGV D8 / D8plus chain hoists and controllers. These will be held in the 37th calendar week.

Those attending the workshops under the direction of Matthias Pohl and Stephan Geidel will obtain an overview of the SQ P2 standards as well as the proper handling, maintenance and testing of ChainMaster chain hoists. The requisite information will be presented in both theoretical and practical form. Participants will learn to conduct tests and perform adjustments to the various safety devices unassisted. They will also obtain the knowledge needed to select the right chain hoists and controllers for different applications and environments. Participants will then be tested and personal certificates issued to all who successfully complete the course. 

The courses run from Monday to Wednesday and involve both the theory and the practice of handling BGV D8 / D8plus chain hoists. They cover the legal fundamentals as well as the equipment, construction and manner of operation of chain hoists and their controllers.

Outside the dates listed, courses can be booked separately by companies and educational institutions. Further information concerning the courses can be found at  www.chainmaster.de.

to the top


 

05.03.2014 

From 7 to 23 February, the global elite of winter sports will be gathering in the Russian town of Sochi for the XXIIth Winter Olympics, in the hunt for gold, silver and bronze medals. In all, since the games were awarded to Sochi, eleven competition venues have been created in and around the Black Sea resort. In equipping several of the venues in the Olympic Park, the organizers have relied inter alia on the know-how of ChainMaster of Eilenburg; numerous products from the range of the manufacturer of chain hoists and lifting gear are being employed at the Sochi games. ChainMaster has been active in Russia and the neighbouring states since 1998, and in 2004 opened ChainMaster Consulting Office Russia.


   

In addition to several smaller projects, ChainMaster’s activities in Sochi have mainly centred on equipping the Bolshoy Ice Dome and the Iceberg Skating Palace, each of which is capable of accommodating up to 12,000 spectators. It is planned to stage the ice hockey matches in the Bolshoy Ice Dome and the artistic and short track ice skating events in the Iceberg Skating Palace.

        

In each of these arenas, ChainMaster equipment forms part of a variety of installations – most notably the system for raising and lowering the two giant video cubes. Here, safety was the paramount concern governing the choice of equipment, the objects in question being extremely heavy. Four ChainMaster dual-chain BGV D8 Jumbo Lifts capable of lifting safely up to twelve tons have therefore been assigned to each cube.

Designed for heavy loads, these hoists are controlled using a Pro Touch StageOperator solution from the CM 880 series, which boasts load measurement and user-friendly positioning functions. The CM 880 series displays loads and positions continuously, the overload and underload thresholds being freely configurable. Furthermore the system offers synchronous run supervision for fixed-speed chain hoists as well as the possibility of programing both relative and absolute target runs for single, line and distributed loads. Safe hoisting of the loads is therefore assured even when, as is here the case, they are being raised to heights in excess of 30 metres.

In the Bolshoy Ice Dome, ChainMaster also provided the pre-rig for the flag system typically seen at international sporting events. For this, the company’s experts installed 108 ChainMaster D8 Plus rigging lifts, each with a safe working load of 250 kg and a limit switch function, governed by an 128-channel control system from the CM 801 series.


            

In the Iceberg Skating Palace, ChainMaster also paved the way for the rigging of the sound system and structure of lighting trusses. For the audio system, four ChainMaster D8 hoists with dual brakes combined with the ChainMaster Pro Touch StageOperator were used, whilst for the lighting trusses, the specialists from Eilenburg opted for sixty ChainMaster D8 rigging lifts with brake functions controlled by a 64-channel system from the CM 801 series.

The controllers of the CM 801 series offer, depending upon the requirement profile, central and de-centralized control systems assembled from more than 40 components that are all compatible with one another, such as motor distributors and operating elements. They are suitable for the direct control of all ChainMaster D8/D8 Plus chain hoists.

All the material supplied will remain in use when the Winter Olympics are over, as it can be employed in a very wide variety of configurations without any conversion measures being required. Furthermore, the CM 801 series is upwards compatible with the CM 880 series, which opens the door to still further possible uses.

to the top


 

06.12.2013

Bereits im Januar 2012 hatte das Gewandhaus zu Leipzig in eine neue ChainMaster Kettenzuganlage nach SQP2 D8Plus investiert. Jetzt wurde die Anlage weiter ausgebaut.

Gewandhaus Leipzig       
Gewandhaus Leipzig

Die Installation im vergangenen Jahr umfasste ein 16-kanaliges „RiggingLift“-Steuerungssystem zum Anschluss von bis zu 16 direktgesteuerten ChainMaster Kettenzügen. Mit Hilfe dieser Steuerung können Kettenzüge betrieben werden, die mit einer Lastmesseinheit für Über- und Unterlastabschaltung sowie einem Inkrementalgeber für die Positionierung ausgerüstet sind. Die Bedienung der Anlage erfolgt bequem über ein Wireless-Farb-Touchpanel 8,4‘‘ der Protouch StageOperator Serie.

Die ChainMaster Kettenzüge können mit dieser Steuerung nicht nur millimetergenau positioniert werden; durch die integrierte Zielspeicherfunktion können außerdem voreingestellte Zielpositionen praktischerweise immer wieder verwendet werden. Für jeden angeschlossen Antrieb können darüber hinaus frei einstellbare Abschaltpunkte für Über-/Unterlast nach Wunsch eingestellt werden.

              

Dazu Bernd Schöneich, Technischer Leiter im Gewandhaus Leipzig: „2012 haben wir die ersten Kettenzüge im Gewandhaus eingesetzt. Dabei wurde die Anlage so ausgewählt, dass eine Erweiterung jederzeit möglich ist. Mit den bisher eingesetzten Kettenzügen von ChainMaster waren wir sehr zufrieden, sodass wir uns entschieden haben, diese Anlage möglichst schnell weiter auszubauen.“

Zum Oktober 2013 wurde diese Anlage erweitert: In diesem Zusammenhang sind neue ChainMaster Kettenzüge vom Typ D8Plus 250 kg sowie eine weitere 16-kanalige „RiggingLift“ Steuerungseinheit in das bestehende System integriert worden. Dem Gewandhaus wird dadurch die komfortable Bedienung von bis zu 32 Antrieben mit dem ProTouch StageOperator ermöglicht – was eine deutlich erhöhte Flexibilität im Hinblick auf die Anforderungen der unterschiedlichen Veranstaltungen bedeutet. Der modulare Systemaufbau der Steuerung bietet darüber hinaus auch in Zukunft noch viele Möglichkeiten zur Vergrößerung der Kettenzuganlage und ist damit prädestiniert für stetig wachsende Veranstaltungshäuser wie dem Leipziger Gewandhaus.

„Wichtig für uns ist ein einfaches und sicheres Handling der Anlage“, meint Bernd Schöneich. „Aufgrund der hohen Veranstaltungsdichte im Gewandhaus wird die Kettenzuganlage von einem relativ großen Benutzerkreis bedient. Deshalb sind gerade der Schutz gegen Überlast und die Positionierungsmöglichkeit für einen sicheren Betrieb von großer Bedeutung. Ein weiterer Vorteil besteht natürlich auch darin, dass die Kettenzüge äußerst flexibel einsetzbar sind und sich an vielen Positionen im Saal einsetzen lassen. Damit können wir sicherstellen, dass überall im Saal Lastmittel zur Verfügung stehen.“

to the top


 

21.11.2013

Martin Dubiel (26) has been a member of the team of ChainMaster Bühnentechnik GmbH in Eilenburg since 2011. Now, he is ensuring orders are delivered on schedule to all points of the globe and constitutes an important pillar in the sales team.

After training as a merchant in foreign trade with a distributor of John Deere GmbH & Co. KG, where he accumulated considerable experience in the sale internationally of agricultural machinery with the focus on foreign trade and customs regulations, he joined the ChainMaster team, where his impact in particular in the fields of export and logistics proved highly positive.

At the same time, he was attending the FOM in Leipzig, from which he graduated with a BA in International Management. Since then, he has been able to make a still more intensive contribution to ChainMaster’s activities in the areas of export and logistics, sales support and demand management.


Martin Dubiel (photo: ChainMaster, may be reproduced freely)

to the top


 

21.11.2013

Current information and schedules on our training program can be found at the following link:

ChainMaster Training Schedule 1. Half of 2014

Article: "Well trained for testing"

             

Participants will receive an overview of current standards, the proper handling and maintenance and testing of electric chain hoists.

He learns the theory and practice to know the general structure of ChainMaster electric chain hoists.

He conducts tests and adjustment of safety devices by. Moreover, he receives knowledge in choosing the right electric chain hoists and their controls for the various applications.

After successfully passing the test participants personal certificates will be handed out.

Next training content we offer gladly on request.

             

to the top